1000m2 Prefabricated Housing | SUMMARY

Save
1000m2 Prefabricated Housing | SUMMARY

Information

  • Project Name: 1000m2 Prefabricated Housing
  • Practice: SUMMARY
  • Products: FTS – Technical Solutions , Farcimar
  • Completion year: 2019
  • Gross Built up Area: 940 Sqm
  • Project Location: Vale de Cambra
  • Country: Portugal
  • Design Team: Samuel Gonçalves, Inês Rodrigues, João Meira, Gonçalo Vaz de Carvalho
  • Engineering: FTS, Technical Solutions
  • Photo Credits: Fernando Guerra | FG+SG
  • Others: Prefabrication and Assembly: Farcimar, Soluções em Pré-Fabricados de Betão
More Info Less Info

Excerpt: 1000m2 Prefabricated Housing, designed by SUMMARY, is a mixed-use development using their prefab and modular building systems. The strategy was clear: a ground floor level for the multi-services program connected with the public space, crowned by the individual habitational units. In the whole building, the structural material – precast concrete – is directly exposed, without any additional finishing reducing its environmental impact.

Project Description

[Text as submitted by architect] After the release of a prototype and the exhibition in La Biennale di Venezia, SUMMARY studio unveils the newest project using their prefab and modular building systems.

1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG
1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG

The requirements for this project were boldly defined from the beginning: the construction should be fast, cost effective and changeable over time, which prompted the studio to use prefabricated elements and to leave parts of the project undefined, assuming the immediacy, flexibility and resources optimization as core themes.

1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG
1000m2 Prefabricated Housing | SUMMARY
© SUMMARY

The strategy was clear: a ground floor level for the multi-services program connected with the public space, crowned by the individual habitational units (six cabins with 45m2). Due to the differences between these two programs, it was created an independent access for each one, placing them in different levels and taking advantage of the natural ground’s slope.

1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG
1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG

The ground floor is shaped by prefabricated slabs and structural panels in the external perimeter. This area was conceived in a very flexible way: it’s possible to add or remove compartments or let the whole floor functioning as a big open space. Thus, the users may adapt the space according to their needs.

1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG
1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG

The first floor is all composed of Gomos System units. Considering that the maximum building area permitted by law was quite small, the requested empty space was used to separate the housing units. Designed and licensed as a collective housing building, with this feature this project offers the main advantages of single houses: clearly individualized entrances and a complete acoustic separation between the different units.

1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG
1000m2 Prefabricated Housing | SUMMARY
© Fernando Guerra | FG+SG

In the whole building, the structural material – precast concrete – is directly exposed, without any additional finishing, thus reducing the resources, the manpower and the arts involved in the construction process and, consequently, reducing its environmental impact. This approach has a direct effect in the acceleration of the building process: all its components are fully prepared in factory and quickly assembled in situ, performing at once as structure, insulation and cladding elements.

Leave a Reply