EB2/3 Taipas School | Pitagoras Group

Save
EB2/3 Taipas School | Pitagoras Group

Information

  • Completion year: 2019
  • Gross Built up Area: 10460 sq. m.
  • Project Location: Guimarães
  • Country: Portugal
  • Design Team: Raul Roque Figueiredo, Alexandre Coelho Lima, Manuel Vilhena Roque
  • Structural Consultants: Projegui
  • MEP Consultants: Feris –Electrical Engineering Layout- Mechanical Engineering
  • Collaborators: João Couto, André Malheiro, João Carvalho, Hélio Pinto, Luis Guimareas, Isabel Rodrigues
  • Photo Credits: João Morgado
  • Others: Projegui- Hydraulics
More Info Less Info

Project Description

[Text as submitted by the Architect] The school is located near the center of Taipas village, in an already consolidated urban area and it was built from another existing school that was completely demolished.

EB2/3 Taipas School | Pitagoras Group
© Pitagoras Group
EB2/3 Taipas School | Pitagoras Group
© João Morgado
EB2/3 Taipas School | Pitagoras Group
© Pitagoras Group
EB2/3 Taipas School | Pitagoras Group
© Pitagoras Group
EB2/3 Taipas School | Pitagoras Group
© Pitagoras Group

In that sense, the proposed intervention aimed not only at replacing the old school facilities, built on a totally dysfunctional scheme, which for a long time had ceased to meet the minimum conditions for teaching and learning, but also proposing the requalification and planning of all the space within the boundaries of the terrain, with the design of its exterior spaces, new playing fields, garden areas or even new areas for students’ recreation, establishing new relationships with their surroundings.

EB2/3 Taipas School | Pitagoras Group
© João Morgado
EB2/3 Taipas School | Pitagoras Group
© João Morgado
EB2/3 Taipas School | Pitagoras Group
© João Morgado
EB2/3 Taipas School | Pitagoras Group
© João Morgado
EB2/3 Taipas School | Pitagoras Group
© João Morgado

Leave a Reply