2022-2023 Moganshan Town · Fuxi River Seven Bridges Conceptual Design International Competition | Open Competition

Save
2022-2023 Moganshan Town · Fuxi River Seven Bridges Conceptual Design International Competition | Open Competition

Information

  • Type: Open Competition
  • Last date of Registration: 15/03/2023

About Competition

Fuxi River Seven Bridges Conceptual Design International Competition is one of the important starting projects of Moganshan Fuxi Water Street Commercial Complex. This competition, co-organized by Deqing County Cultural Tourism Development Group Co., Ltd. and Young Bird Plan, aims to call for the participation of talented designers, passionate amateurs and design firms domestically and worldwide. The forward-looking, innovative and diverse conceptual designs will be collected from architecture, landscape, bridge and art fields. Through creating seven footbridges for Fuxi Water Steet, it starts the correct method of opening Moganshan, and publicizes the Shanghai Style image of an international town, vigorous and diversified. The landscape nodes are integrated with pedestrian friendly and inclusive spaces, seeing lush mountains and lucid waters. And distributed work and fashionable lifestyle coexist as well, making it a human habitat.

Design Requirements

To design seven footbridges above Fuxi River (Moganshan Town Section), enhance the slow traffic system of waterfront spaces of Fuxi River, improve the quality of daily travel and public spaces, integrate modernity and adapt to changes in the future, create landscape nodes with pedestrian, sightseeing, travel, view appreciation and connection functions, seeing lush mountains and lucid waters, and to present the Shanghai Style culture and international fashionable lifestyle of Moganshan Town. The architectural style should reveal the local characteristics and the feature of the times. Design should comply with relative design rules in China. It should pay attention to the combination of architecture and structure functions, and consider the reasonability of construction budget as well as the landing result and the sustainability in the future.

Participants could select one or more of the seven footbridges for their design in this competition.

Design Goals

1. Correct method of opening Moganshan:

The goal of this competition is to design seven footbridges for Fuxi Water Street, enhancing the slow traffic system of waterfront spaces of Fuxi River (Moganshan Town Section); meanwhile, to present Moganshan Town’s Shanghai Style image – international, vigorous and diversified; and distributed work and fashionable lifestyle coexist in this human habitat.

2. Aim to create slow traffic landscape nodes:

The competition aims to improve daily travel and the quality of public spaces, integrate modernity and adapt to changes in the future, connect waterfront spaces of Fuxi Water Street within town area, create landscape nodes for Fuxi Water Street with pedestrian, sightseeing, travel, view appreciation and connection functions, seeing lush mountains and lucid waters.

3. Comply with the overall planning of Fuxi Water Street:

On the basis of the site condition, participants shall fully consider the overall planning of Fuxi Water Street Commercial Complex, and submit conceptual designs that comply with the planning. (For detailed materials, please see “Site overview” in the Competition Documents.)

4. Technical and landing requirements:

After meeting all requirements stated above, reasonably use advanced technologies and materials. The landing result should be ensured.

To find more details & Register visit HERE

LAST DATE OF REGISTRATION: 15 March 2023

—–

Note: If you are a Competition/Award/Event organiser, submit your Competition/Award/Event to ArchiDiaries for publication by LOGGING to ArchiDiaries

Leave a Reply