Wemb Fire Station | Tchoban Voss Architekten

Save
Wemb Fire Station | Tchoban Voss Architekten

Information

  • Completion year: 2021
  • Gross Built up Area: 881.30 sqm
  • Project Location: Schafweg
  • Country: Germany
  • Lead Architects/Designer: Ekkehard Voss
  • Design Team: Alessandra Dieseldorff, Mathias Koch, Tomasz Kozaczek, Alexander Loss
  • Clients: Municipality of Weeze, Weeze
  • Structural Consultants: Tebartz Ingenieurbuero GmbH, Issum
  • Landscape Consultants: Seeling + Kappert GbR, Weeze
  • Project Manager: Thomas Sperfeldt
  • Interior + Furniture: TCHOBAN VOSS Architects, Hamburg
  • Photo Credits: Hans Juergen Landes
  • Others: Cooperation partner: HuelsmannThiemeMinor. Architektenpartnerschaft mbB, Kleve (stages 6-8), Building equipment: fuhrmann + keuthen GmbH, Kleve, Fire protection: Burckhardt Pabst und Partner, Cologne, Metalwork and carpentry: Paul Swertz GmbH, Goch, Clinker, aquaterra Salinagrau: Klinker- u. Keramikwerke A. Berentelg & Co. KG, Recke, Clinker, Granada BA+FU: Hagemeister GmbH & Co. KG, Nottuln
More Info Less Info

Excerpt: Wemb Fire Station by Tchoban Voss Architekten is an architecture project for the regional fire brigade in the Wemb district of the municipality of Weeze. The building consists of two flat structures that overlap by almost five metres. The shared grey clinker-brick façade gives the new buildings the appearance of a coherent unit. The design was awarded first prize in the architectural competition.

Project Description

Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes
Wemb Fire Station | Tchoban Voss Architekten
Site Plan © Tchoban Voss Architekten

[Text as submitted by architect] A new fire station has been built for the regional fire brigade on Schafweg in the Wemb district of the municipality of Weeze in North Rhine-Westphalia. The building consists of two flat structures that overlap by almost five metres. The shared grey clinker-brick façade gives the new buildings the appearance of a coherent unit. The design was awarded first prize in the architectural competition.

Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes
Wemb Fire Station | Tchoban Voss Architekten
Ground Floor Plan © Tchoban Voss Architekten
Wemb Fire Station | Tchoban Voss Architekten
Section © Tchoban Voss Architekten
Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes

The building’s first volume is a hall for fire engines; this has a floor area of approximately 320 sqm and a height of 5.75 m. Abutting it at right angles is the main fire brigade building, which contains social areas with changing rooms and a training room. A workshop and additional storage rooms complete the spatial programme. The technical rooms are located on the second floor of the main building.

Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes
Wemb Fire Station | Tchoban Voss Architekten
Elevation © Tchoban Voss Architekten
Wemb Fire Station | Tchoban Voss Architekten
Section © Tchoban Voss Architekten
Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes

For the façade, standard-format aquaterra Salinagrau (grey) clinker bricks were chosen. The building’s main openings – the fire-engine gates, the main entrance and training room, and the alarm entrance – are framed with red clinker and have a metallic red core.

Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes
Wemb Fire Station | Tchoban Voss Architekten
Elevation © Tchoban Voss Architekten
Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes

The building’s outdoor facilities are divided into natural and functional recreational areas. The functional areas are all located in the direct vicinity of the building. They include a 23-space car park in the south-eastern part of the site. Its location ensures quick access to the fire station via Schafweg from the town centre. An adjoining lawn could in future be used to create another 12 parking spaces.

Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes
Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes
Wemb Fire Station | Tchoban Voss Architekten
© Hans Juergen Landes

In addition to functionality, the architects focused on sustainability and efficient and economical operation of the building. Heat is provided by a combined heat and power unit. The ventilation systems are fitted with a highly efficient heat-recovery system.

Leave a Reply